Mechanical Finisherscase study.
We built a new website for Mechanical Finishers, a metal finisher and zinc plater in Cincinnati, in 6 days.
- 6daysFrom brief to launch
- 6process pagesEach with its routing and applications
- 3engineering toolsIncluding the bake advisor
Mechanical Finishers at a glance
- Client
- Mechanical Finishers Inc.
- Industry
- Metal finishing and zinc plating
- Location
- Cincinnati, Ohio
- Project started
- July 29, 2026
- Delivered in
- 6 days
- Services
- Website design, AI assistant, Engineering tools, Quote form
- Live site
- mechfin.com
What was wrong with the old Mechanical Finishers site
Mechanical Finishers has been finishing metal since 1992, has been ISO 9001 registered since 2002, and runs six processes on one site. Its old WordPress site gave two founding dates, kept its best technical detail on old inner pages, and had a contact form that could not carry a quote request.
The old homepage is shown as the Internet Archive saved it on 16 March 2025, and the old inner pages as it saved them in 2022 and 2023. Every Now screenshot shows the live mechfin.com.
01
The homepage could have belonged to any finisher
The old homepage opened with "Established since 1985" while the text below said 1992, and its counters read 43 years and 12 services while the inner pages said 17 years and 8 services. The rest was a general essay on mass finishing, so a buyer learned little about this plant, and a quality reviewer saw two founding dates on one screen.
What we changed. We wrote the homepage around the route a part takes through the plant, from parts washing and shot blasting to zinc plating, passivation, and final check. It opens with "High volume metal finishing. Cincinnati, Ohio." and lists the figures a buyer checks: since 1992, ISO 9001 registered since 2002, 2,000 lb per hook on the spinner hanger, and stampings up to 24 by 36 inches through zinc plating.
02
Every process sat in one dropdown menu
Eight services shared one dropdown menu, and the strongest technical content, such as mechanical plating for fasteners above about Rockwell C40, sat on inner pages last updated in 2022 and 2023. Engineers search for the process and the specification, and no single page answered them.
What we changed. Each of the six core processes now has its own page: electro zinc plating, mechanical zinc plating, passivation, deburring and polishing, parts washing, and shot blasting. Each page explains what you get, the five step process routing, and typical applications, and the mechanical zinc page cites ASTM B695.
03
The contact form could not carry a quote request
The only form asked for a name, email, phone number, and a "Preffered Time To Call", with a message box capped at 180 characters. There was nowhere to say which process, what material, or what volume, so every request needed a phone call before anyone could price it.
What we changed. The new quote form asks for the company, the process, the part material, the annual volume, and the part and finish details, with guidance on what to send with an RFQ, or request for quote. Cloudflare Turnstile and a hidden field keep spam out.
04
The About button led to another domain
The homepage About button pointed to an unfamiliar domain, mech.weebie.tech, and the footer still read "Copyright 2022" in 2025. Procurement and quality teams check a supplier’s history before approving it, and the company’s real history was out of sight.
What we changed. We rebuilt the About page around one date, "Finishing parts for the Ohio Valley since 1992", with the awards and milestones in order, including ISO 9001 registration since 2002 and zinc plating brought in house in 2019. Every link now stays on mechfin.com.
What changed for Mechanical Finishers
mechfin.com now has 27 pages. An engineer with a hardened fastener can check the plating route on the site and arrive at the quote form with the answer in hand, and a voice and chat assistant on every page answers questions as "Need help? Start a call".

Engineering tools to use before calling
A hydrogen embrittlement bake and route advisor shows what ASTM F1941, ISO 4042, and ASTM B633 each require at a given hardness. A thread plating allowance calculator and a media lodging risk calculator sit beside it.

Capacity, industries, and service area
A capabilities page states every capacity as a number, from small fasteners to 24 by 36 inch stampings and 2,000 lb per hook. An industries page covers six industries, and six service area pages cover the Ohio Valley.
You can open mechfin.com to see every page described here. We turned this project into our page on websites for metal finishers. The PLI case study shows the same work for a manufacturing support group, and the SurfTech case study shows it for a coating company.
Every site we build follows the same manufacturing website design process, and SEO and social media can start once the site is live. You can see all our manufacturing website case studies, or read how our manufacturing marketing agency works.
Google Search results, day by day
From 10 September to 10 November 2026, mechfin.com earned 138 clicks and 8,124 impressions in Google Search, at an average position of 18.3. Most clicks come from searches for the company name, followed by local searches such as "zinc plating near me" and "chrome plating cincinnati". The figures come from the company’s own Google Search Console, Google’s free report of how a site appears in search.
- Clicks from Google
- 138
- Impressions
- 8.12K
- Click-through rate
- 1.7%
- Average position
- 18.3
| Search | Clicks | Impressions |
|---|---|---|
| mechanical finishers | 21 | 71 |
| mechanical finishers inc | 7 | 143 |
| zinc plating near me | 2 | 20 |
| mechanical metal finishing | 1 | 52 |
| chrome plating cincinnati | 1 | 50 |
| deburring companies near me | 1 | 20 |
| anodizing near me | 1 | 11 |
| plating near me | 1 | 8 |
Daily figures for mechfin.com
| Day | Clicks | Impressions | Average position |
|---|---|---|---|
| Sep 10 | 1 | 137 | 20.3 |
| Sep 11 | 0 | 606 | 7.3 |
| Sep 12 | 0 | 123 | 34.6 |
| Sep 13 | 1 | 133 | 31.8 |
| Sep 14 | 4 | 184 | 17.4 |
| Sep 15 | 2 | 174 | 20.9 |
| Sep 16 | 2 | 152 | 20.2 |
| Sep 17 | 2 | 153 | 19.2 |
| Sep 18 | 4 | 150 | 17.6 |
| Sep 19 | 0 | 125 | 25.1 |
| Sep 20 | 0 | 85 | 19 |
| Sep 21 | 5 | 149 | 15.7 |
| Sep 22 | 3 | 145 | 12.4 |
| Sep 23 | 6 | 151 | 12.6 |
| Sep 24 | 1 | 135 | 10.1 |
| Sep 25 | 5 | 163 | 18.4 |
| Sep 26 | 0 | 82 | 19.1 |
| Sep 27 | 1 | 93 | 20 |
| Sep 28 | 3 | 135 | 15.9 |
| Sep 29 | 4 | 137 | 11.7 |
| Sep 30 | 4 | 128 | 13 |
| Oct 1 | 3 | 135 | 11.3 |
| Oct 2 | 2 | 143 | 23.2 |
| Oct 3 | 0 | 107 | 29.1 |
| Oct 4 | 1 | 95 | 21.2 |
| Oct 5 | 4 | 173 | 21.4 |
| Oct 6 | 0 | 127 | 15.7 |
| Oct 7 | 3 | 152 | 16.1 |
| Oct 8 | 1 | 127 | 13.1 |
| Oct 9 | 1 | 149 | 19.3 |
| Oct 10 | 0 | 91 | 15.2 |
| Oct 11 | 1 | 97 | 23.7 |
| Oct 12 | 1 | 118 | 13.7 |
| Oct 13 | 2 | 123 | 17.1 |
| Oct 14 | 4 | 131 | 21.4 |
| Oct 15 | 6 | 140 | 17.7 |
| Oct 16 | 6 | 119 | 21.2 |
| Oct 17 | 0 | 74 | 30.6 |
| Oct 18 | 0 | 67 | 27 |
| Oct 19 | 1 | 133 | 24.6 |
| Oct 20 | 3 | 123 | 20.3 |
| Oct 21 | 4 | 162 | 17.4 |
| Oct 22 | 5 | 117 | 17.2 |
| Oct 23 | 2 | 153 | 21.2 |
| Oct 24 | 0 | 86 | 26.2 |
| Oct 25 | 0 | 72 | 28.9 |
| Oct 26 | 0 | 137 | 19.7 |
| Oct 27 | 1 | 135 | 15.9 |
| Oct 28 | 5 | 123 | 16.8 |
| Oct 29 | 5 | 115 | 17.8 |
| Oct 30 | 3 | 109 | 22.3 |
| Oct 31 | 0 | 68 | 28.6 |
| Nov 1 | 0 | 62 | 18.2 |
| Nov 2 | 3 | 120 | 18.9 |
| Nov 3 | 4 | 118 | 15.4 |
| Nov 4 | 7 | 143 | 16.3 |
| Nov 5 | 2 | 102 | 13.8 |
| Nov 6 | 5 | 145 | 18.8 |
| Nov 7 | 1 | 63 | 24.1 |
| Nov 8 | 0 | 83 | 24 |
| Nov 9 | 3 | 139 | 16 |
| Nov 10 | 1 | 108 | 21 |
Source: the mechfin.com property in Google Search Console's Performance report, Sep 10, 2026 to Nov 10, 2026.
What the dashboards show
These figures come from Mechanical Finishers Inc.’s own accounts, and each one sits beside the screenshot it was read from.
mechfin.com
Google Search Console, 28 days to 25 September 2026
- Impressions in Google search
- 2,770
- Clicks to the site
- 36
- Average click-through rate
- 1.3%
- Average position
- 16.8
Page two of the results

These figures are from seven weeks after launch. An average position of 16.8 is the second page of results, so most of these impressions are not yet producing clicks. What matters at this stage is that Google is showing the pages at all, because before the rebuild there was very little for it to show.
Get a website like Mechanical Finishers’, built around your plant.
Tell us what your company makes and who buys it. We will reply in writing with the scope, a fixed price, and a launch date.







