How to write a website RFP
A complete website RFP (request for proposal) template you can copy, with a scoring sheet, price bands to budget against, and the questions that separate the bidders.
Written by Shopfloor Agency's lead engineer, who holds a bachelor's degree in Mechanical Engineering and has spent 10 years on marketing for manufacturers.
What this guide concludes
- Decide the budget before you write the document, and put the range in it. An RFP with no number is answered by firms guessing at three different projects, and the responses cannot be compared.
- Three to five bidders is the working range. Ten wastes nine firms’ weeks and yours, and the good ones learn to recognize a list that long and decline it.
- The section only you can write is the capability brief: what you make, in what materials, to what tolerances, under which certifications. No agency can invent it, and every project that stalls stalls here.
- Ask who writes the technical content and how many hours of your people it needs. That single question separates firms that have built a manufacturing site from firms that have not.
- Require source code ownership, a named hosting arrangement, and an exit path in the RFP rather than in the contract. Raising it after selection is a renegotiation, and you will lose it.
- Ask for a fixed price against a fixed scope, plus a published hourly rate for anything outside it. A time and materials quote with no cap transfers all of the risk to you.
- Score the responses before you meet anybody. A written sheet filled in from the documents alone is the only defense against choosing the firm with the best presenter.
- Do not ask for spec work. Requesting homepage designs before selection filters out every firm with enough work to be worth hiring, and leaves you choosing on decoration.
- A good agency will tell you which parts of your RFP are wrong. Treat a bidder who challenges the brief as a stronger signal than one who agrees with all of it.
- The published market runs from a few thousand for a small specialist build to $100,000 and above from the larger industrial agencies. Know which band you are in before you send anything.
Contents15 sections
Before you write it
The document
When an RFP is the right instrument, and when to skip it#
An RFP is worth writing when the decision has to be defensible to somebody who will not be in the room, or when you cannot choose between firms without comparable written answers. It is worth skipping when one person decides, the budget is modest, and two conversations would settle it. The document is a procurement instrument, and running one on a project too small to need it costs more in delay than it returns in diligence.
Most manufacturers who ask us about an RFP are somewhere in the middle: the owner has decided the site needs replacing, a number has been half agreed, and nobody wants to be the person who picked wrong. That is a real problem, and an RFP is one of several answers to it.
| Write one when | Skip it when |
|---|---|
| A board, an owner, or a parent company has to see how the choice was made | One person decides and will live with the result |
| Several firms look alike from outside and you need comparable answers | You already know who you want and are checking the price |
| The project touches an ERP, a distributor portal, or several divisions | The site is under about fifteen pages with no integrations |
| Procurement has a threshold that requires competitive bidding | The build costs less than the internal time an RFP consumes |
| The last project failed and you want the requirements written down this time | The requirements are genuinely still unknown, in which case buy a scoping engagement first |
A lighter alternative, when the project is small
Write a one page brief instead. It covers what you make, what is wrong with the current site, what the new one has to do, the budget range, and the date you want it live. Send it to three firms and ask each for a scope and a price. You will get most of the comparability of an RFP for about a day of work instead of three weeks, and firms respond faster to it.
Decide the number before you ask for it#
Agree a range internally before writing a word, and publish it in the document. The usual objection is that bidders will quote to the top of the range. The larger and more common problem is receiving a $9,000 proposal and a $70,000 proposal for what you thought was one project, with no way to compare them, because each firm guessed at a different scope.
A budget range does more to define the scope than to set up a negotiation. It tells a bidder which version of the project to propose, and it lets firms who cannot serve you at that number decline early instead of producing a proposal you will not accept.
| Band | Who works here | What it typically includes | What to confirm |
|---|---|---|---|
| Under $5,000 | Specialist independents and very small studios | A focused build of five to fifteen pages, with capability content written from your own documents | Confirm who writes the technical copy, and confirm you get the source code |
| $5,000 to $20,000 | Small agencies and experienced freelance teams | A larger site, some custom templates, basic integrations, and a photography allowance | Ask what the ongoing charge is after launch, and whether hosting is compulsory |
| $20,000 to $60,000 | Established industrial marketing agencies | Research, positioning work, user experience design, custom design, CRM integration, and a launch plan | Ask which of those you actually need, because several are separately priced elsewhere |
| $60,000 and above | The larger industrial and B2B agencies | Multi-site builds, distributor portals, ERP integration, translation, and account-based marketing programs | Ask whether a strategy engagement is a precondition, and what it costs on its own |
Two firms in this category publish a strategy engagement priced separately from the build, at figures between about $3,900 and $12,000, and treat it as a precondition. That is a defensible way to work and it is a real cost to plan for, so ask directly whether a paid discovery phase is required before anyone will quote the site.
What actually moves the number
- The number of capability pages that need writing from scratch matters most. This is almost always the largest line, and it is the one most manufacturers assume is free.
- It matters whether usable photography exists. A build with no plant photography either buys stock, which looks like every competitor, or schedules a shoot.
- Integrations change the shape of the work. A CRM, an ERP, a distributor portal, or a part configurator each change the project instead of simply adding to it.
- The number of people who approve matters. Three approvers is a schedule. Nine is a different project at a different price.
- Translation and export control need planning early. Both are cheap to plan for and expensive to retrofit.
Who to send it to, and how many#
Send it to three to five firms. Each serious response costs a bidder several days, so a list of ten wastes nine firms’ weeks and produces a pile you cannot read carefully. Build the list by looking at manufacturing sites those firms actually built rather than at their own marketing, and check those sites against criteria a buyer would use.
The usual way a shortlist gets built is a search for manufacturing website agencies, which returns a listicle written by one of the agencies on it. Those lists are useful for names and worthless for ranking, because the publisher put itself first.
A better way to build the list
- Collect names from three or four sources, including any roundup articles, your trade association, and the sites of manufacturers you admire. Many industrial sites credit their agency in the footer.
- Open the manufacturing sites each firm built, and leave the firm’s own site for later. Those client sites are the product you are buying.
- Score two of those sites yourself on whether they publish tolerances, certifications with scope, an equipment list, and a quote path that accepts a drawing. Most fail, which is informative.
- Check the work is recent and still live. One site showcased as a leading example in a widely read article now redirects to the company that acquired the client.
- Include one firm outside your assumed price band, above or below. It calibrates the others and occasionally changes your mind.
Our own study of 66 US manufacturer websites found that 4 cited a materials or process standard and 45 carried a quote path on the homepage. If a portfolio site clears both, the firm that built it has done something most of the market has not. The ten criteria are published in full and take about fifteen minutes to run.
What a manufacturing website RFP has to contain#
A manufacturing website RFP needs ten sections: who you are, what is wrong now, what the new site must do, the capability brief, technical requirements, who writes the content, the budget range, the timeline, the ownership terms, and how you will decide. Together they run to four to eight pages, and anything longer is boilerplate that every bidder skims.
The order matters less than the presence of each section. What follows is what each one is for, written from the position of somebody who has to price the work from it.
| Section | What it must answer | What a bidder does with it |
|---|---|---|
| 1. Company and context | What you make, where, how big you are, and who owns the decision | Decides whether to bid at all |
| 2. What is wrong now | Specific failures of the current site, with URLs | Prices the problems instead of guessing at them |
| 3. What the new site must do | Outcomes in your words, ranked | Proposes an architecture and drops anything that serves none of them |
| 4. Capability brief | Processes, materials, tolerances, volumes, certifications, and buyers | Sizes the content work, which is the largest variable |
| 5. Technical requirements | Integrations, hosting, accessibility, languages, and export controls | Identifies the parts that change the project |
| 6. Content responsibility | Who writes, who approves, and how many hours you can give | Prices writing, and flags the risk that stalls most projects |
| 7. Budget range | A range, and whether it includes photography and content | Proposes the right version of the project |
| 8. Timeline | Target launch, and anything immovable such as a trade show | Says whether it is achievable |
| 9. Ownership and exit | Source code, hosting, domain control, and what happens if you leave | Either agrees or withdraws, which is the point of asking early |
| 10. Process and dates | Deadline, questions window, criteria, and decision date | Plans the response and knows whether the process is serious |
The capability brief, which only you can write#
The capability brief states what you make, in what materials, to what tolerances, at what volumes, under which certifications, and who buys it. No agency can invent this section, every project that stalls stalls here, and the firms worth hiring will tell you the same thing. Half a day with the person who prices the work produces it.
This is the part of the document that determines whether you get a website or a brochure. An agency can research your market, study your competitors, and design something handsome. It cannot know that you hold plus or minus 0.0002 inches on a particular family of parts, that you decline anything under 250 pieces, or that your ISO certificate covers two of your three buildings.
What to write down, with an example of each
- Name your processes the way a buyer names them, such as five-axis milling, Swiss turning, wire EDM, centerless grinding, and mechanical zinc plating. Category words such as precision manufacturing describe nothing.
- List materials by grade, such as 6061-T6, 17-4 PH, Inconel 718, and C360 brass. The exact designation tells a buyer far more than the material family does.
- State the tolerances you hold in production, which is a different number from the one you hold on your best day.
- Give the size envelope and part weight, largest and smallest. This is the first filter a buyer applies and the one most often missing.
- State your volumes, meaning the minimum order, the typical run, and the largest annual quantity you have delivered.
- List certifications with their scope, the registrar, the expiry, and which entity or site each certificate covers.
- Name the industries and audit regimes you have survived, since a buyer wants evidence you have been through theirs.
- List your equipment by manufacturer and model, where you are willing to publish it.
- Say what work you decline. Publishing this ends the inquiries you would have refused in week three, and it costs nothing.
- Say who buys, by job title, and what each of them checks before saying yes.
Writing technical requirements a bidder can price#
State the constraints and let bidders propose the solution. Naming a platform in advance usually names the one somebody read about, and it can exclude the right answer. What belongs in the RFP is what must integrate, what must be editable by whom, what accessibility standard applies, and what has to be measurable after launch.
The technical section of most website RFPs is either empty or a list of technologies chosen before the requirements. Both make the responses worse. What a bidder needs is the set of facts that change the shape of the work.
Requirements written so a bidder can price them
| Vague | Priceable |
|---|---|
| The site should be fast | Every page must reach interactive within 2.5 seconds on a 4G connection, measured on the launched site |
| It needs to be mobile friendly | The capability tables and the quote form must be usable on a 375 pixel wide screen without horizontal scrolling |
| We want good SEO | Each process, material, and industry gets its own page that search engines can read, at its own address, and the site publishes Organization and PostalAddress structured data |
| It should integrate with our systems | Quote form submissions must create a record in [named CRM] and email [named inbox] within one minute, with the drawing attached |
| It has to be accessible | WCAG 2.2 AA, verified with an automated pass and a keyboard-only walkthrough of the quote path before acceptance |
| We need to be able to update it | Two named staff must be able to add a capability page and edit a spec table without developer help, demonstrated during handover |
| Support multiple languages | English at launch, with Spanish and German added within twelve months, priced separately and stated now |
The technical items manufacturers most often forget
- Find out who controls the domain and the DNS, the settings that point your domain at the website. It is frequently a person who left in 2019, and it is far easier to sort out before the project starts than on launch day.
- Check whether export control applies. If any drawing or specification is subject to ITAR or EAR, that constrains hosting, file handling, and who may access the staging site.
- Decide where uploaded drawings go, who can read them, and how long they are kept. Buyers ask, and most sites cannot answer.
- Map redirects from the existing site one to one. Missing redirects are the most common cause of traffic loss after a relaunch.
- Keep analytics in an account your company owns, so the history stays with you whichever agency you work with.
Who writes the words, and the hours it takes from your side#
Ask who writes the technical content and how many hours of your people it needs. That one question separates firms that have built a manufacturing site from firms that have not, because only the first kind answers it comfortably. Content is the largest cost variable and the most common reason a project runs late.
A design can be produced without you, but technical content cannot. Somebody has to state the tolerance, and the only people who know it work in your building. A sound proposal therefore contains a number of hours it needs from your side, and a proposal that contains none has either hidden it or has not thought about it.
The three workable models
| Model | Your hours | Works when | Fails when |
|---|---|---|---|
| You write, they edit | High | Somebody internal writes well and has the time | That person is also running the shop |
| They interview and write | Medium | Your experts will give two or three hours of interviews | Nobody is made available, and the copy goes generic |
| They write from your documents | Low | Capability statements, quality manuals, and drawings exist | The documents are out of date, which nobody discovers until review |
Whichever model is chosen, write the approval process into the RFP. Name who signs off technical accuracy, name who signs off tone, and give each a working-day turnaround. Most late website projects are late because a review sat with somebody for three weeks. That is a scheduling problem you can prevent in the document.
Ownership, hosting and the exit path#
Put source code ownership, hosting arrangements, domain control, and the exit path in the RFP rather than in the contract. Raised at RFP stage it is a requirement every bidder answers before they have won anything. Raised after selection it is a renegotiation with the firm you already chose, and you will lose it.
This is the section manufacturers most often leave out and most often regret. The failure mode is familiar: the site is fine, the relationship cools, and it turns out the code lives in an account you do not control, on hosting you cannot leave, with a monthly charge that has to keep being paid for the site to stay up. Changing a phone number takes a week and an invoice.
What to require, in these words
- Source code. On final payment, the complete source is delivered to us, and we may host it, modify it, or give it to another supplier without restriction or further fee.
- Hosting. State what you propose, what it costs a year, and whether we may host elsewhere. A build that only runs on your infrastructure must say so in the proposal.
- Domain and DNS. The domain is registered to us, in an account we control, before launch.
- Analytics and Search Console. Both are created under our account, with the agency added as a user.
- Third-party licenses. List every paid plugin, theme, font, or service the site depends on, with its annual cost and whose name the license sits in.
- Exit. Describe what we receive within ten working days of ending the relationship, and what it costs.
- Content rights. Photography, copy, and illustration produced for us are ours, with any stock licenses transferred or identified.
A bidder who cannot agree to these is not necessarily a bad firm. Some build on proprietary platforms and say so, and that is a legitimate trade. What matters is learning it now. The source code question is worth understanding before you ask it.
The template, in full, to copy#
The whole template is below as text you can copy. Replace the bracketed parts, delete what does not apply, and keep it under about eight pages. The capability brief in section four is the part that decides whether you get useful proposals.
Copy this into a document, work through the brackets, and delete any section that does not apply to your project. It is written to be short enough that every bidder reads all of it.
1. Company and context
[Company] is a [process] manufacturer in [city, state], founded in [year], with [number] employees across [number] facilities. We make [what] for customers in [industries]. This request covers the design and build of a replacement website at [current URL]. The decision will be made by [name, title], with input from [names, titles].
2. What is wrong with the current site
[List specific failures with URLs. For example: the request for quote form cannot accept a drawing file; capability information exists only inside a PDF at [URL]; the certification page shows a certificate that expired in [year]; the site takes [number] seconds to load on a phone; nothing states our tolerance range or size envelope.]
3. What the new site must do, in priority order
[Ranked list. For example: 1. Produce more requests for quote that arrive complete enough to price. 2. Let a specifying engineer confirm our capability without contacting us. 3. Support supplier approval by publishing certifications with their scope. 4. Attract applicants for [roles]. 5. Present [company] as a credible supplier to [named tier or industry].]
4. Capability brief
Processes: [list]. Materials and grades: [list]. Tolerances held in production: [range]. Size envelope: [largest and smallest part, with weight]. Volumes: [minimum order, typical run, largest delivered]. Certifications: [standard, registrar, certificate number, expiry, and which site or entity each covers]. Industries served: [list]. Key equipment: [manufacturer and model]. Work we decline: [list]. Who buys: [job titles, and what each one checks].
5. Technical requirements
Integrations: [CRM, ERP, quoting system, named]. Quote submissions must [create a record in X and email Y within one minute, with the drawing attached]. Accessibility: [WCAG 2.2 AA]. Languages: [English at launch; others, with dates, priced separately].
Export control: [state whether ITAR or EAR applies to any published material]. Editing: [number] named staff must be able to add a capability page and edit a specification table without developer help. Redirects: every existing URL must be mapped to its replacement. Analytics and Search Console must be created under accounts we own. Domain and DNS are controlled by [name] and will remain in our accounts.
6. Content responsibility
Please state who writes the technical content, their background, how many hours of our staff’s time you need and from which roles, and what happens to the schedule if those hours are not available. We can make [number] hours available from [roles]. Technical accuracy will be approved by [name] and tone by [name], each within [number] working days. Existing material available to you: [capability statement, quality manual, drawings, photography, spec sheets].
7. Budget
Our range for this project is [$X to $Y], covering [design, build, content, photography, first year hosting]. Please state clearly what your price includes and excludes, quote a fixed price against a fixed scope, and give an hourly rate for anything outside it. State any recurring charge after launch, annually.
8. Timeline
We would like the site live by [date]. [State anything immovable, such as a trade show or a rebrand.] Please give a realistic schedule with milestones, and say plainly what would cause it to slip.
9. Ownership, hosting and exit
On final payment the complete source code is delivered to us, and we may host it, modify it, or transfer it to another supplier without restriction or further fee. Please confirm you accept this, or explain why you cannot. List every paid plugin, theme, font, or service the site depends on, with annual cost and license holder. Describe what we receive within ten working days of ending the relationship, and what it costs.
10. How we will decide, and when
Proposals are due by [date] to [name and email]. Questions must reach us by [date]; every question and its answer will be sent to all bidders on [date]. We are asking [number] firms. We will score written responses against the criteria below before any meeting, then meet the two highest scorers in [week]. We expect to decide by [date]. We are not asking for speculative design work; please send examples of sites you have built for manufacturers instead. Criteria and weights: [paste the scoring table].
One line in section ten does more work than any other: stating that you are not asking for speculative design. It is the sentence that keeps busy firms on the list.
Sending it, and the timeline to give#
Give at least two weeks to respond, three if the capability brief is long. Name one contact. Set a date for questions and a date on which you will send every question and answer to all bidders at once, which is what keeps the process fair and is the step most manufacturers skip.
The mechanics are simple and the errors are consistent. A deadline of five working days removes every firm with existing commitments, which is every firm worth hiring. Answering one bidder’s question privately gives that bidder an advantage and, more damagingly, means the others price a different project.
A workable six week sequence
- Week 0: agree the budget range internally. Settle a range with whoever signs before you write anything. An RFP with no number produces responses that cannot be compared, because each firm has quoted a different project.
- Week 1: write the capability brief. List what you make, in what materials, to what tolerances, at what volumes, under which certifications, and who buys it. This is the section no agency can write for you, and every stalled project stalls here.
- Week 1: list what is broken about the current site. Write down specifics instead of impressions: the quote form nobody can find, the capability page that is a PDF, the certificate that expired in 2023. Bidders can price a problem, and they cannot price an adjective.
- Week 2: assemble the document from the template. Work through the sections in order: company and context, the problem, scope, technical requirements, content responsibility, budget range, timeline, ownership terms, how you will decide, and the deadline.
- Week 2: pick three to five firms. Look at the sites they built for manufacturers, which tell you more than their own site does. Check whether those sites publish tolerances, certifications with scope, and a quote path.
- Week 3: send it with a questions window. Give a named contact, a date by which questions must arrive, and a date on which you will send every question and answer to all bidders at once. That last step is what keeps it fair.
- Week 5: score the written responses before meeting anyone. Fill in the scoring sheet from the documents alone. Presentations move scores toward whoever presents best, so record the position you held before that happened.
- Week 6: meet the two highest scorers. Ask each to walk through one manufacturing site they built and explain a decision they now think was wrong. Confirm the people in the room are the people doing the work.
Tell firms who are not selected, promptly and in one line. It costs nothing, it is rarer than it should be, and the firm you decline this year is sometimes the firm you want in three.
The questions that separate the bidders#
Ask these nine questions, chosen because the answers vary between firms. The most useful is the last: ask what they would change about your brief. A bidder who challenges the requirements has read them, and a bidder who agrees with everything has read the budget.
- Which manufacturers have you built for in the last two years, and what does each of them make? It tests recency and relevance in one question, so ask for URLs.
- Who writes the technical content, and how many hours do you need from our staff? It is the single most predictive question on the list.
- How will a buyer send us a drawing, and what happens to it then? A firm that has built for manufacturers answers with a process. A firm that has not answers with a contact form.
- What structured data will the site publish, and why? Nine of ten agencies in this category publish almost none on their own sites, so the answer distinguishes quickly.
- What will you do about our existing URLs? The right answer includes the words redirect map. There is no other right answer.
- Who will actually do the work, and are they in this meeting? Ask for names and roles rather than a team page.
- What does this cost us in year two and year three? Ask about hosting, licenses, maintenance, and any retainer, and get an annual figure.
- Tell us about a project that went wrong and what you changed afterward. Every firm with a history has one. A firm with none is either new or unreflective.
- What is wrong with this RFP? Ask it directly. The best answers we have seen to this question came with a rewritten requirement attached.
A scoring sheet, filled in before anybody presents#
Score the written responses from the documents alone, before anybody presents. Presentations move scores toward whoever presents best, which is a real skill and rarely the one you are buying. Recording the position you held beforehand is the only defense against it.
Weight the criteria before the responses arrive, so the weights describe what you need rather than what the strongest bidder happens to offer. The table below is a starting point, and the weights are worth arguing about internally before you accept them.
| Criterion | Weight | What a ten looks like |
|---|---|---|
| Relevant manufacturing work | 20 | Named plants in the last two years, with what each one makes |
| Who writes the technical content | 15 | A named person, a process, and the hours required from your side |
| The quote path they propose | 12 | File upload, routing, response process, and how it gets measured |
| Structured data and technical build | 10 | A specific answer about structured data, page speed, and whether search engines can read every page |
| Price against a fixed scope | 12 | A total, a payment schedule, and an hourly rate for anything outside it |
| Source code ownership and exit | 10 | An unqualified yes, in writing, with the handover described |
| Timeline and its dependencies | 8 | A date, plus what slips it, stated in their words rather than yours |
| Who does the work | 8 | The people on the project, and whether the person presenting is one of them |
| What they told you was wrong | 5 | At least one challenge to your brief, with a reason |
Price carries twelve points here rather than fifty, which surprises some procurement teams. The reasoning is that a website that produces no quote requests is expensive at any price, and the criteria above the price line are the ones that predict whether it will. Adjust the weight if your situation genuinely differs, and write down why.
Two rules that make the sheet work
- Every scorer fills it in alone, first. Discussing before scoring produces one opinion held by four people.
- Anything scored below four needs a written sentence. It forces the reason into the open, and it is what you will read again in a year when somebody asks how the decision was made.
Why good agencies decline to bid#
Agencies decline RFPs for predictable reasons: too many bidders, spec work requested, no budget stated, an unrealistic deadline, requirements that describe a different project, and a process that reads as a formality with an incumbent already chosen. Each one is fixable, and fixing them improves who answers.
It is worth knowing why the firm you wanted did not reply. The reasons are commercial rather than personal, and most of them are visible in the document before it is sent.
| Reason | What they saw | The fix |
|---|---|---|
| Too many bidders | Eight or more firms invited, so the odds do not justify the days | Invite three to five and say how many |
| Spec work requested | Homepage designs asked for before selection | Ask for relevant built work and the reasoning behind it |
| No budget stated | No way to know which version of the project to propose | Publish a range |
| Deadline too short | Under two weeks, which reads as a decision already made | Two to three weeks, set when you send it |
| The requirements contradict themselves | A forty page site and a four week timeline in the same document | Ask one trusted firm to read it before you send it to five |
| It reads as a formality | Requirements written around one supplier’s product | Write the requirements from your needs, or skip the RFP |
| Wrong size | The budget is far below or far above where the firm works | Nothing to fix, and it is why a range saves everyone time |
The mistakes that show up in most website RFPs#
Seven mistakes account for most of the difference between an RFP that produces comparable proposals and one that produces a pile nobody can read. All seven are in the document rather than in the process, and all seven are cheap to fix before sending.
- There is no budget. It is the single most common mistake, and the one that makes the responses impossible to compare.
- Requirements are written as adjectives. Modern, clean, user-friendly, and professional cannot be priced, delivered, or disputed.
- A platform is chosen before the requirements. It excludes answers you have not heard of yet.
- There is no capability brief. That guarantees generic copy, because the agency will write what it can research.
- The document is silent on content hours. The project then stalls in week five and everybody is surprised.
- Ownership is left to the contract. By then you have chosen, and the only pressure you had has gone.
- It asks for a page count instead of an outcome. Asking for forty pages produces forty pages. Ask for pages that answer the questions buyers arrive with, and let the count follow.
Questions manufacturers ask about website RFPs#
Here are eight questions manufacturers ask about website RFPs, each answered so it can be read on its own.
Do I need an RFP for a website at all?
You need one only when the decision has to be defensible to somebody else, or when you genuinely cannot choose between firms without comparable written answers. For a build under about $15,000 with one decision maker, two conversations and a written scope usually get you further than a formal document. The RFP earns its cost when a board, an owner, or a parent company has to see that the choice was made on stated criteria.
How long should a website RFP be?
Most manufacturers need four to eight pages. The capability brief and the list of what is broken carry the weight. Anything past about ten pages tends to be boilerplate that every bidder skims, and it lengthens the response without improving it. Length in the response is not a virtue either, and a scoring sheet is what stops it becoming one.
Should the RFP include a budget?
Yes, as a range. The common fear is that firms will quote to the top of it. The larger risk is that without a number you receive a $9,000 proposal and a $70,000 proposal for what you thought was one project, and you have no basis to compare them. A range also filters out firms who would have wasted your time and theirs.
Is it reasonable to ask for design work before selecting an agency?
It is reasonable to ask, and it filters in the wrong direction. Firms with enough work decline to produce speculative homepage designs, so a request for spec work removes the busiest and usually the best bidders and leaves you choosing between decorations produced without any research. Ask instead for a site they built for a manufacturer and the reasoning behind three specific decisions on it.
How many agencies should I send it to?
Send it to three to five. Each serious response costs a firm days of work, so a list of ten wastes nine firms’ weeks and produces a pile you cannot read properly. Experienced agencies ask how many others are bidding, and a large number is a common reason to decline.
What should never go in a website RFP?
A demand for spec work, a list of technologies chosen before the requirements, a deadline shorter than two weeks, a requirement to sign the bidder’s own contract unseen, and a scoring method that is kept secret. Each of those either removes good bidders or makes the responses impossible to compare.
Should I specify the platform in the RFP?
State the constraints instead and let bidders propose. What matters is who can edit the site in two years, whether it integrates with what you already run, what it costs annually, and whether you own what is built. A platform named in advance is usually the one somebody read about, and it can quietly exclude the right answer.
What if we have no idea what a manufacturing website should cost?
Published bands in this market run from under $5,000 for a small specialist build to $100,000 and above from the larger industrial agencies, and our own fixed price is $6,000. Most manufacturers under $50 million in revenue land between $5,000 and $30,000 depending on how many capability pages need writing from scratch. The band table in this guide sets out what each range typically includes.
Written by someone who read the drawings first
Shopfloor Agency is led by an engineer who holds abachelor's degree in mechanical engineering and works only with US manufacturers and industrial service companies. That background is why this guide spends its time on tolerances, certifications, and what a good request for quote looks like.
- First published
- September 5, 2026
- Last checked
- September 5, 2026
- Length
- 30 minutes, 15 sections
- Price
- Free to read
Digital marketing for manufacturers
How a US manufacturer gets found online and wins quote requests, with every channel ranked, what each one costs, a 90 day plan, and 46 named sources.
Manufacturing website examples
We measured sixty-six US manufacturer websites against ten checks a buyer makes, and show what the best ones do well and where most fall short.
Industrial SEO: a guide for industrial companies
How to build your keyword list from your own quote log, turn it into a list of pages, fix the technical faults common on industrial sites, and measure the results over a long sales cycle.
Manufacturing marketing strategy
The six decisions behind a manufacturing marketing strategy, from who buys to what it costs, with a twelve month plan and a one page version you can fill in.
How much does a manufacturing website cost?
A custom manufacturing website costs $10,000 to $25,000 for 10 to 20 pages and $25,000 to $50,000 with a product catalog, and a specialist industrial agency such as Windmill Strategy starts at $40,000. Ours is $6,000, one time.
What pages does a manufacturing website need?
A manufacturing website needs a home page, a page for each process, and pages for industries, quality and certifications, equipment, quotes, contact, and careers. This guide sets out what goes on each one and how many you need.
RFQ forms for manufacturers
An RFQ form should ask for the drawing, the quantity, the material, the process, and the date needed, accept the CAD files buyers send, and get a reply the same day.
How long SEO takes for manufacturers
Searches for one process in one material usually move in three to six months, and broad searches in nine to eighteen. Google says some changes take effect in a few hours and others take several months.
What goes on a process page
A manufacturing process page names one process, states the materials, sizes, tolerances, and standards as text, shows the equipment, answers the questions buyers ask, and ends with a button to the quote form.
Getting cited by ChatGPT and Google
Google says there are no extra requirements to appear in AI Overviews or AI Mode, and OpenAI says ChatGPT search finds sites through its OAI-SearchBot crawler. Complete process pages, comparison pages, and accurate listings do most of the work.